Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Highland Village
If you’re planning a second-story addition or an ADU on a Highland Village lot, the project usually starts with your HOA’s architectural committee, not the city permit desk. We know that sequence well. Highland Village is close to built out, so most work here is renovation and infill rather than new construction, and that shapes the whole calendar. We walk Highland Village homeowners through the submittal packet, the approval gates and the build order so nothing sits exposed waiting on a review. Our technicians have up to 11 years of experience. Call (833) 620-7367 to schedule your free estimate.
Why Highland Village Homeowners Call Construction Frisco for Home Additions & ADU
Most of Highland Village was finished in the 1980s and 90s along the southern shore of Lewisville Lake, which means the housing stock is mature and the projects are second-story pop-ups, garage conversions and room additions rather than greenfield builds. That’s a different job than a new subdivision out past the tollway, and we plan for it from the first site visit.
We’re set up for the full scope under one contract. That matters on a Highland Village addition because the framing, the exterior finishes, the roof tie-in and the windows all have to agree with what your HOA already approved. Seven trades under one roof means one point of accountability instead of scheduling four contractors who never talk to each other. Our relationship with more than 50 name-brand manufacturers helps here too: we can spec the right material for a Highland Village lot instead of swapping brands mid-project because something went out of stock.
Response to Highland Village is straightforward. We answer 24/7, and dispatch runs 7am to 7pm, Sunday through Friday. We’re closed Saturday. Our technicians have up to 11 years of experience on additions and structural work.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Highland Village
ADU Design & Permitting
Because Highland Village is essentially built out, an ADU here almost always means an infill project on an existing lot, which triggers HOA architectural review before the city permit is even filed. We prepare the submittal packet, file it, answer the committee’s questions and pull the permit once the design is signed off. Getting that order right is why these projects don’t stall halfway through.

Garage Conversion ADU
A garage conversion is the most common ADU path in Highland Village, and for good reason: the footprint, utilities and driveway already exist. We evaluate the slab-on-grade and the existing walls before design, then handle the interior build, insulation, finishes and the utility tie-ins. A typical garage conversion in Highland Village runs $30,000 – $80,000.

New Detached ADU
A detached ADU on a mature Highland Village lot means working around established landscaping and close-in fences. We offer both traditional site-built construction and prefab or modular systems through partners like Abodu, Dvele and Cover, so you can weigh speed, budget and customization before committing. A typical detached ADU in Highland Village runs $90,000 – $220,000.

Junior ADU & Interior Conversion
Sometimes the right answer is interior. A junior ADU or a converted portion of the existing home can add living space without touching the roofline, which tends to keep the HOA review simpler. We map out plumbing, egress and separation before anyone swings a hammer.
Second Story Additions
Second-story additions are the other major category in Highland Village, since the lots are tight and there’s nowhere to build out. The existing roof and load-bearing walls have to be evaluated before design, and the mature oak trees close to many foundations often call for arborist input and root protection during excavation. A typical home addition in Highland Village runs $45,000 – $130,000, and the written estimate sets the final price.
Room Additions, Sunrooms & Enclosed Patios
A room addition or an enclosed patio is often the smallest way to gain square footage on a built-out Highland Village lot. We tie the new roof and exterior finishes into what’s already there so the addition reads as part of the original house, not a bolt-on.
For a broader look at how we handle these projects, our home additions & ADU team covers design through final inspection.
Trusted Brands We Service in Highland Village
Material choice is where Highland Village additions go wrong fastest. The brands homeowners ask about most often are Abodu, Dvele and Cover on the prefab ADU side, and we work with all three. Because we hold relationships with more than 50 name-brand manufacturers across the trades, we spec the right brand for the job rather than working around whatever is on hand. We don’t stock parts locally, so what you choose is ordered to the approved plan, which keeps color and height consistent with your architectural review. From foundation to finish line, one contractor handles it.
Common Home Additions & ADU Problems We See in Highland Village Homes
- HOA review filed after materials are ordered. Colors, heights and styles get approved on paper first. Order the shingles or siding early and you can force a change order you didn’t budget for.
- Assuming the original slab and walls can carry a second story. A 1980s Highland Village slab-on-grade and its load-bearing walls need an engineer’s evaluation before design, or you’re looking at a structural retrofit mid-project.
- Framing scheduled before the architectural packet clears. North Texas spring storms don’t wait for a committee, and an addition left open to the weather is an expensive mistake.
- Root damage from excavation near mature oaks. Many Highland Village lots have trees close to the foundation, and cutting through the root zone without arborist input can weaken the tree and complicate the inspection.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Highland Village, TX
Here’s what homeowners in Highland Village are typically looking at. These are estimated ranges, and the written estimate sets the final price.
| Project Type | Typical Estimated Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves a Highland Village number is structural work, whether the existing roof and walls can carry a second story, arborist and root-protection measures, HOA-driven material choices, utility upgrades for an ADU, and the summer heat and spring storm season that set the exterior work calendar. None of that is guesswork. We put it in a line-item written quote and the price doesn’t change once work starts. Estimates are free.
How We Handle Highland Village HOA Architectural Review
This is where a Highland Village addition is different from the same project in Flower Mound or Lantana. Because the city is built out, additions here trigger HOA architectural review and a submittal packet before the city permit is even filed. We file the packet. It includes the site plan showing the addition relative to the lot lines and the existing oaks, elevation drawings for the new facade, the exterior material and color specifications, the height relative to the neighboring homes, the roof pitch to match the existing, and the window style to keep the street consistent. Getting that right the first time is what keeps you out of a second review cycle.
Once the committee signs off, we pull the permits and start framing. On a typical second-story addition in a 1980s Highland Village subdivision, the roof and load-bearing walls are evaluated before design, the arborist weighs in on the trees close to the foundation, and the framing rough-in inspection is held until the architectural committee approves the exterior materials and height. That sequencing matters: we don’t schedule framing before the packet clears, so the addition is never sitting open while the review runs. The draw schedule is tied to those approval gates, and the punch list waits until final inspection sign-off. That way you’re not paying for work that can’t proceed.
What typically gets approved in Highland Village: brick veneer in a tone that matches or complements the existing facade, composition shingle roofs with a pitch that matches the main house, heights that sit below or level with the existing ridge line, and window styles consistent with the original home. We bring that knowledge to the design table, not after the fact.
Spring storm season and the summer heat do the rest of the scheduling. Exterior work runs around the storm window and the hottest weeks, which is one more reason to start the HOA process early.
We Also Serve Cities Near Highland Village
Highland Village sits close to a lot of our north Texas work. We also serve Flower Mound, Lewisville, Corinth and Lantana, and the same HOA-first sequence applies across most of those. If you’re in one of those cities and planning an addition or ADU, the submittal process is the first thing we map out. Call (833) 620-7367 and we’ll tell you what your packet needs.
Serving Highland Village, TX – Our Local Coverage Area
We serve Highland Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Highland Village
Typically a few weeks on top of the city permit timeline, though it varies by committee and packet completeness. We file it early so review runs while the design is still being finalized rather than after. Call (833) 620-7367 for an exact quote on your project – estimates are free.
Brick veneer that matches or complements the existing facade, composition shingle roofs with the same pitch as the main house, and heights at or below the existing ridge line are the materials most often approved. Window styles consistent with the original home go through cleanest. Call (833) 620-7367 and we’ll review your existing finishes and your HOA guidelines.
Yes, in almost every case. A second-story pop-up adds load to the existing load-bearing walls and the slab-on-grade, and an engineer’s evaluation is how we confirm it can carry it before design. Skipping it is how mid-project retrofits happen. Call (833) 620-7367 to start the evaluation.
Usually yes. The footprint, utilities and driveway already exist, so a garage conversion is the most common ADU path in Highland Village. A typical garage conversion runs $30,000 – $80,000. Call (833) 620-7367 for an exact quote – estimates are free.
We front-load the exterior work into the mild windows and keep interior work running through the heat. Framing isn’t scheduled until the HOA packet clears, so the addition is never left exposed to a spring storm. Call (833) 620-7367 to schedule your free estimate.
No. We put the price in a line-item written quote before work begins, and the written estimate sets the final price. The only change orders are ones you approve. Call (833) 620-7367 for a written estimate.
Ready to plan your addition or ADU? Call (833) 620-7367. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. Estimates are free, we pull the permits, and we work with your insurer where it applies. One contractor, from foundation to finish line.
Written by the team at Construction Frisco.